Retail

PetsMart and Shops, Folsom Gateway

Map: Click here
Location: Folsom
Project Description:
Construction of ground-up 27,527 sf PetsMart “Pet Hotel” store and a 10,881 sf shop building.

Hyundai Showroom - Westfield Downtown Plaza

Map: Click here
Location: Westfield Downtown Plaza
Sacramento, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Project consists of selective demolition of two adjacent retail tenant spaces and interior improvements of a new 7200 sf showroom for Hyundai. New work included high end storefront system with automatic pedestrian and auto slide doors, new ceramic tile floors throughout, painting, electrical, lighting and power and new finishes to the adjacent loading dock

K-Mart Facade

Map: Click here
Location: Auburn, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Exterior improvements and new facade to an existing Kmart store.

Sports Authority - Westfield Solano

Map: Click here
Location: Fairfield, CA
Project Manager: Clayton Winey
Project Superintendent: Stan Everhart
Project Description:
The project includes all landlord work for a new tenant, Sport’s Authority, who will occupy the first floor of an existing two story retail building at the Solano Mall. The project includes a new lower level mall entrance, complete new exterior facades, site work, utility relocations and extensions, and interior finishes.

Mervyn's Conversion, Solano Mall

Map: Click here
Project Description:
Conversion of existing two story Mervyn's store to multi-tenant retail space.

Old Navy & Eddie Bauer Demolition

Map: Click here
Location: Citrus Heights
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Interior demolition, selective exterior demolition and new utilities to convert two adjacent retail spaces into a single 30,600 SF space for a new grocery store tenant. Specific work included asbestos abatement, interior demolition, removal of all roof-top equipment and associated piping, new domestic water service, and new grease interceptor.

Pad 6 Folsom Gateway Phase II

Map: Click here
Location: Folsom, CA
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat
Project Description:
Project consists of site preparation and improvements, construction of a 6,219 sf wood framed shell building and tenant improvements for a new bank.

Payless Shoe Source TI

Map: Click here
Location: Rock Creek Plaza, Auburn, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Shell and tenant improvements for new 5,000 sf Payless Shoe Source in existing shopping center.

Petco Unleashed, San Jose (Branham)

Map: Click here
Project Description:
Tenamt Improvement work to construct a new 4,505 sf Petco Unleashed store. This project includes structural and non-structural demolition, 4,505 SF of new interior tenant improvements and a new structural entry. The project is scheduled to start on August 1st with a six week construction schedule.

PETCO, Auburn

Map: Click here
Location: Rock Creek Plaza, Auburn, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Complete tenant improvement for new PETCO store in Auburn, CA. Included demo of existing tenant spaces, upgrade utilities, complete interior finishes, new MEP including installation of new 800 amp service, exterior upgrades to meet tenant prototype

Re-Tenanting Vacated Mervyn's Building

Map: Click here
Location: Fairfield, CA
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat
Project Description:
Project consists of demolition, structural upgrades, separation of utility services and architectural work required to re-tenant a vacated two story Mervyn's building

Westfield Galleria at Roseville - Nine retail stores

Map: Click here
Project Manager: Katie Cull
Project Superintendent: Joe Paul, Michael Sanderson
Project Description:
Tenant Improvements at Roseville Galleria for 9 individual spaces including Galleria Nails, Beauty by Thread, Fab Bravo, Downeast Basics, No Fear, Naarjtie, AT&T, Windsor Fashions, and No Skinny. This project includes the construction of interior tenant improvements for nine of the tenant spaces that were damaged during the mall fire in October 2010. The project is fast tracked with completion scheduled for late August which will enable all tenants to open in early October.
• naartjie 1,379 sf
• No Fear 1,160 sf
• Fab Bravo 1,249 sf
• AT&T Parriot Cellular 713 sf
• No Skinny 1,678 sf
• Beauty By Thread 800 sf
• Windsor Fashions 2,989 sf
• Down East Basics 1,416 sf
• Galleria Nails 790 sf

Sur La Table Renovation - Santana Row, San Jose

Map: Click here
Project Manager: Clayton Winey
Project Superintendent: Michael Sanderson
Project Description:
Open store remodel of a Sur La Table at Santana Row in San Jose, CA. The project includes the construction of a new Ware Wash room inside the existing stockroom and new improvements to the sales floor. Work includes selective demolition, concrete, stained concrete floors, rough and finish carpentry, drywall/paint, epoxy flooring, fire sprinklers, plumbing, HVAC and electrical.

Sur La Table, Burlingame

Map: Click here
Location: Burlingame, CA
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat
Project Description:
Project consists of tenant improvements for a 7,432 sf retail space for the sales of kitchen wares. Work includes selective demolition, new ware wash room, offices, installation of modular and custom fixtures and cabinets, specialty flooring, finishes, and mechanical and electrical systems.

Sur La Table, Palo Alto

Map: Click here
Project Manager: Clayton Winey
Project Superintendent: Michael Sanderson
Project Description:
Project includes the interior remodel of the existing store with a 1016 sf expansion of both retail and storage areas into an adjacent space. Work includes structural additions to the existing post & beam roof structure, new wood storefront system, metal stud framing and drywall, interior finishes and casework, plumbing, mechanical including exposed spiral ductwork , and decorative lighting and electrical.

Total Wine & More, Sacramento

Map: Click here
Project Description:
The project includes exterior modifications to a former Circuit City building near Cal Expo and the complete interior tenant improvements for Total Wine. The project is scheduled to take 3 months.

ULTA Landlord Improvements

Map: Click here
Location: Folsom, CA
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat
Project Description:
Project consisted of underground, electrical, plumbing, drywall, storefront, awnings and main electrical.

Buffalo Wild Wings Exterior Facade - Westfield

Map: Click here
Location: Fairfield, CA
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat
Project Description:
Site work and the structural and architectural modifications to an existing building at the Solano Mall for a new tenant. Work completed in an open center where accessibility and guest safety are paramount.

Bed Bath & Beyond
and Pad 7
Folsom Gateway Plaza

Map: Click here
Location: 2385 Iron Point Road, Folsom, CA 95630
Project Description:
Project consisted of the new construction of a 35,000 sf Bed Bath & Beyond retail store and a stand-alone 15,00 sf retail shops building located in Folsom, CA. The Bed Bath & Beyond store was constructed under a fast-tracked schedule, and was completed in 145 consecutive calendar days. The Bed Bath & Beyond is CMU masonry wall construction with a steel joist and metal deck roof structure. Interior finishes include a polished and sealed concrete floor, exposed roof structure, and an office mezzanine. The roofing materials consist of single ply roofing and concrete tile on the tower roofs. The Pad 7 Building is a wood framed multi-tenant retail shops building, with built up and concrete tile roofing, 3 coat lath & plaster with integral color finish coat, and a central plaza seating area with a fountain.

Rock Creek Plaza

Map: Click here
Location: 2515 - 2705 Bell Road
Auburn, CA 95603
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat and Joe Paul
Project Description:
Project consisted of the open store renovation of the Rock Creek Plaza. Renovation of an existing 34,550 sf building into a new Best Buy Store. Renovation of an additional 50,640 sf of existing buildings in addition to the construction of a new shell for Beverages and More. Complete reconstruction and landscaping of the site. Façade including demolition, new decorative hardscape, storefronts, exterior finishes, awnings, re-roof, stucco and paint.

Natomas Park Shops D,E & F

Map: Click here
Location: 1905 Danbrook and
2000, 1010, 2020
Club Center Drive
Sacramento, CA
Project Description:
Project consisted of the construction of a neighborhood retail shopping center, including 3 shops buildings and 8.5 acres of site and offsite improvements. Building work included shell and tenant improvement work. Buildings consisted of wood framed retail tenant buildings, including lath and plaster exteriors, cultured stone, decorative towers, and awnings. A full build-out for Fitness 19 was included, as well as vanilla shell improvements for the remaining lease space. Site and offsite work was completed during the rainy season, and included lime-treatment. Stamped asphalt, high end landscaping, and decorative parking lot lighting accent this neighborhood shopping center.

DSW Shoes
and Shop Bldg.
Folsom Gateway Plaza

Map: Click here
Location: 2395 Iron Point Road, Folsom, CA 95630
Project Manager: Clayton Winey
Project Description:
Shell and site construction of a new 21,225 sf concrete tilt-up retail shell building.

Grocery

Food 4 Less Vallejo

Map: Click here
Location: Vallejo, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Removal and replacement of sales floor area concrete in an open store environment.

Nob Hill #621, Martinez - Decor Remodel

Map: Click here
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Open store décor remodel of a 37,806 sf Nob Hill grocery store. All work will be performed at night allowing the store to remain open during normal business hours. The work includes new interior finishes in the sales area, public restrooms, and food preparation departments. Interior architectural finishes include new stained and polished concrete floor in the main sales area, new ceramic wall tile in the food preparation departments, new ceilings including upgraded lighting, painting, and graphics.

Nob Hill #623, Napa - Decor Remodel Project

Map: Click here
Location: Napa, CA
Project Description:
Open store décor remodel of a 35,000 sf Nob Hill grocery store. All work will be performed at night allowing the store to remain open during normal business hours. The work includes new interior finishes in the sales area, public restrooms, and food preparation departments. Interior architectural finishes include new stained and polished concrete floor in the main sales area, new ceramic wall tile in the food preparation departments, new ceilings including upgraded lighting, painting, and graphics.

Raley's conversion to Food Source

Map: Click here
Location: Elk Grove, CA
Project Manager: Brent Wiegand
Project Superintendent: Joe Paul
Project Description:
Project consists of the re-branding and conversion of a Raley’s grocery store into a Food Source. Scope of work included selective demolition, structural upgrades and interior architectural finishes and décor. The overall project schedule was five weeks including the initial two weeks of open store construction followed by three weeks of dual shift closed store remodel.

Smart & Final Remodel, Stockton

Map: Click here
Project Description:
Remodel of existing Smart & Final store in Stockton, CA. Open grocery store remodel (14,688 sf) including interior and exterior improvements. Interior work includes interior metal stud/drywall curtain walls about the cooler and freezer cases, under floor plumbing for new floor sinks, complete restroom remodel including ADA compliance, painting and electrical. Exterior work included new receiving dock concrete paving, remove and replace failing asphalt, ADA parking stalls and signage, adjustment of existing grades for ADA path of travel, slurry and striping. Project duration was 3 weeks.

Smart & Final, San Jose

Map: Click here
Location: San Jose
Project Manager: Clayton Winey
Project Superintendent: Michael Sanderson
Project Description:
Interior and exterior remodel of a Smart & Final in San Jose, CA. The project includes both day and night work and phased construction sequencing to keep the store fully operational. Work includes selective demolition, building and site concrete, parking lot repairs, slurry coat and restripe, new curtain walls, doors and frames , painting, epoxy, flooring, plumbing and electrical.

Smart & Final, Seaside

Map: Click here
Location: Seaside, CA
Project Manager: John Steffens
Project Superintendent: Jeff Coker
Project Description:
Open grocery store remodel (14,958 sf) including interior and exterior improvements. Interior work includes interior metal stud/drywall curtain walls above the cooler and freezer cases, under floor plumbing for new floor sinks, complete restroom remodel including ADA compliance, painting, electrical and complete new lighting layout. Exterior work includes slurry coat and striping. Project duration is 4 weeks.

Bel Air #522 Remodel, Gold River

Map: Click here
Project Manager: Katie Cull
Project Superintendent: Joe Paul
Project Description:
Remodel of an existing 57,879 sf Bel Air grocery store, located in Gold River, CA.

Nugget Market
Elk Grove

Map: Click here
Location: 7101 Elk Grove Blvd.
Elk Grove, CA 95758
Project Manager: Clayton Winey
Project Description:
Project consisted of the complete renovation of an existing 65,000 sf grocery store building. This is our second Nugget store and our 5th project for Nugget Markets. After the El Dorado Hills store, it is amazing to see the bar being raised in Elk Grove. This store will truly be a showcase in Nugget's portfolio. This Nugget Market has a full commercial kitchen, including cooking facilities and a pizza oven. The mezzanine area includes management offices and a conference room. The finishes in this store are very unique and include a free-hand stained concrete floor, numerous faux paint finishes, and a stainless steel kitchen, deli, sushi, and bakery area. Hand made ornamental iron stair rails, awnings, and sculptures accent the interior and exterior of the store. The exterior is a piece of art in itself with a 30 ft tall sunflower adorning it's facade.

Bel Air #526 Remodel

Map: Click here
Location: Woodland, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Removal of select food service equipment, selective demolition of interior finishes and concrete for new underground plumbing and soda lines, installation of new finishes, fire sprinklers, electrical, and installation of new self-service and full service equipment and displays.

Nugget Market
El Dorado Hills

Map: Click here
Location: 4500 Post Street
El Dorado Hills, CA 95672
Project Manager: Clayton Winey
Project Description:
Project consisted of the complete renovation of an existing 65,000 sf grocery store building. The facade was completely rebuilt and a mezzanine with an accessible lift was added. Each Nugget Market is a unique experience, and this was no exception. This Nugget Market has a full commercial kitchen, including cooking facilities and a pizza oven. The mezzanine area includes management offices, a conference room, a demonstration kitchen, and guest seating area. The finishes in this store are very unique and include a checkerboard stained concrete floor, numerous faux paint finishes, and a stainless steel kitchen, deli, sushi, and bakery area. Hand made ornamental iron stair rails, awnings, and sculptures accent the interior and exterior of the store.

Food 4 Less - Vallejo

Map: Click here
Project Description:
Expansion and renovation of existing loading dock facilities for the Food 4 Less grocery store located in Vallejo, CA. Project duration was 60 calendar days. Work was completed in an open-store environment, with dock remaining operational throughout construction.

Office

Davis Langdon Office TI

Map: Click here
Location: 1331 Garden Hwy
Ste. 310
Sacramento, CA
Project Superintendent: Charlie Bisharat
Project Description:
Interior improvements of 3,300 sf office. Project was awarded LEED certification

Rex Moore Electrical

Map: Click here
Location: 6001 Outfall Circle
Sacramento, CA 95828
Project Superintendent: Joe Paul
Project Description:
Tenant improvement of approximately 13,000 sf Interior office and 16,000 sf production/warehouse in an existing concrete tilt up building.

Scottrade TI

Map: Click here
Location: 2371 Iron Point Road
Folsom, CA 95630
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Tenant Improvement office space for Scottrade

Industrial

Nugget Market
Central Bakery
Woodland

Map: Click here
Location: 2710 Hanson Way Woodland, CA 95695
Project Superintendent: Joe Paul
Project Description:
Construction of a new Central Bakery Facility for Nugget Markets, Inc. located within their existing warehouse / distribution center in Woodland, CA.

Raleys Production Bakery Addition

Map: Click here
Location: 3925 Seaport Blvd. West Sacramento, CA
Project Superintendent: Joe Paul
Project Description:
Addition of a new spiral freezer, ammonia refrigeration plant, and machine room to existing production bakery facilities within Raley's Distribution Center Warehouse in West Sacramento.

Site Work

Natomas Park
On & Off Site Work

Map: Click here
Location: 2000, 2010, 2020
Club Center Drive
Sacramento, CA
Project Description:
Site & Offsite construction of a new 8.5 acre retail site. Site and offsite work was completed during the rainy season, and included lime-treatment. Stamped asphalt, high end landscaping, and decorative parking lot lighting accent this neighborhood shopping center.

Armed Forces Facade Work - Solano Mall - Fairfield

Map: Click here
Location: Fairfield, CA
Project Manager: Clayton Winey
Project Description:
Project consists of renovation of the existing hardscape, site structures and amenities in front of the Armed Forces Recruitment Center at Solano Mall. Work includes demolition of existing concrete, sidewalks and above grade planters, new deck and planter waterproofing, re-configure above grade planters, new concrete hardscape, ornamental iron fence and gate, painting, landscaping, pots and plantings.

Stanford Creek Office Corridor Work and Site Improvements

Map: Click here
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat
Project Description:
The project includes a 4.5 acre parking lot expansion for a new tenant at an office campus in Rocklin. The project is scheduled to start in October 2011 with substantial completion before the new year. Work includes rough grading, rock excavation, underground utilities, site concrete, asphalt paving, ADA upgrades to the existing parking lots, landscaping & irrigation, and site lighting.


Rocklin Commons

Map: Click here
Location: Rocklin, CA
Project Manager: Jeff Coker
Project Superintendent: Jeff Coker
Project Description:
The project includes the initial rough grading phase of the 53 acre retail parcel in Rocklin in preparation for site and building construction scheduled for 2012. Unique to the project was the mitigation of documented wetlands and extensive SWPPS measures in preparation of the 2011-2012 winter.

Healthcare

Valley Skilled Nursing Facility

Map: Click here
Location: Sacramento, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
The scope of work includes the preparation of two existing door/window assemblies, finishes and electrical to accommodate two new automatic entry doors.

Doctor's Express TI, Fair Oaks

Map: Click here
Location: Fair Oaks, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
Project consists of tenant improvements for a 2,990 sf medical clinic and treatment center. Work includes interior non-structural demolition and new construction and finishes of medical offices and exam rooms, x-ray room, triage and waiting / reception areas.

APS Healthcare

Map: Click here
Location: Sacramento, CA
Project Manager: Clayton Winey
Project Superintendent: Joe Paul
Project Description:
New interior finishes in an occupied office including remove and replace carpeting and base, painting, and plastic laminate cabinets. The work was scheduled over a single weekend resulting in no disruption to the normal business operations of the office.

Doctor's Express, Sacramento

Map: Click here
Project Description:
Tenant Improvements for a 2,861 SF Doctor's Express, located at 3635 Bradshaw Road in Sacramento.

Multi-Family / Apartment

PRIDE Industries, Inc. Re-Entry Facility

Map: Click here
Location: Sacramento
Project Description:

Renovation of an existing apartment complex to meet Federal Bureau of Prison standards. Work included interior, exterior and site renovation.

Hospitality

Radisson Hotel TI / Remodel

Map: Click here
Location: Dublin, CA
Project Manager: Clayton Winey
Project Superintendent: Charlie Bisharat
Project Description:
Interior remodel of existing operating Radisson Hotel. Including complete restoration / remodel of the restaurant and bar, main ballroom, conference rooms and reception area.

1120 Iron Point Road, Suite 170, Folsom, CA 95630 | CA Lic. #871228
Phone:(916)608-4800 | Fax:(916)608-4810